Catapult Federal Services
Cleanroom Construction Scheduler (Owners Rep)
Skills
9 months ago
Share this opportunity
Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.
Important information
Contract type:
Freelance / Contract
Location:
Boise, ID, USA
Work mode:
Onsite
Published on:
7 August 2026
What they need
Skilled Trades
Boise, ID Contract To Hire Jan 27, 2026
Cleanroom Construction Scheduler Department: Cleanroom Construction/MEP
Location: Boise, Idaho
Duration: 1-year Contract-to-Hire
Work Model: On-site
Number of Openings : 2
- Per diem included!
Owner's Representative - Scheduler Job Description Seeking an experienced Construction Scheduler to serve as Owner's Representative for semiconductor fabrication facility construction projects in Boise, Idaho. This critical role requires expertise in complex capital project scheduling, critical path analysis, and semiconductor facility construction sequencing. The Scheduler will develop, maintain, and analyze comprehensive project schedules that coordinate cleanroom construction, MEP installation, process tool integration, and production ramp activities across multi-billion-dollar facility expansions . Primary Responsibilities As Owner's Representative Scheduler , you will create and maintain integrated master schedules for semiconductor fabrication facility construction projects using Primavera P6. Your schedules will serve as the foundation for project decision-making, resource allocation, and executive reporting across projects ranging from $50M cleanroom buildouts to $15B+ fabrication expansions.
Develop detailed construction schedules encompassing all project phases including design, procurement, site preparation, structural construction, architectural finishes, cleanroom installation, MEP systems, process utilities, tool installation, commissioning, qualification, and production ramp. Establish logical relationships and constraints between activities, define critical and near-critical paths, and identify schedule risks and opportunities.
Coordinate schedule development with multiple general contractors, trade contractors, equipment vendors, and internal company teams including Facilities, Manufacturing, Process Engineering, and Quality. Integrate contractor baseline schedules into master project schedules, ensuring alignment with our overall facility delivery strategy and semiconductor tool installation timelines.
Conduct schedule analysis including critical path identification, float analysis, what-if scenarios, schedule compression opportunities, and resource leveling. Perform variance analysis comparing baseline to actual progress, identifying slippage causes and developing recovery plans. Generate lookahead schedules at various intervals (2-week, 6-week, 90-day) to support field coordination and resource planning.
Lead weekly and monthly schedule review meetings with contractors and project teams. Evaluate contractor schedule updates for logic, completeness, and accuracy. Analyze schedule impacts from design changes, RFIs, change orders, and unforeseen conditions. Review and validate time extension requests and acceleration proposals from contractors.
Project Controls Integration Collaborate with cost engineers to support earned value management analysis, linking schedule performance to cost performance. Provide schedule data for project forecasting, trend analysis, and executive dashboards. Support claims analysis and dispute resolution through detailed schedule forensics and delay impact analysis.
Develop scheduling standards and templates specific to semiconductor facility construction. Maintain schedule basis documents including calendars, activity code structures, WBS hierarchies, and resource libraries. Ensure schedules comply with industry’s best practices and owner requirements.
Coordinate schedule integration across interdependent projects including facility construction, utility infrastructure upgrades, tool installations, and operational transitions. Map critical interfaces between shell/core construction, cleanroom fit-out, MEP rough-in/trim, and tool hook-up activities.
Required Qualifications
- Bachelor's degree in Construction Management, Engineering, or related field
- Minimum 5-10 years of construction scheduling experience with at least 5 years on complex capital projects over $50M
- Expert-level proficiency in Primavera P6 (P6 EPPM or P6 Professional)
- Strong understanding of critical path method (CPM) scheduling principles and techniques
- Experience with semiconductors, pharmaceutical, data center, or other mission-critical facility construction preferred
- Knowledge of construction means and methods across all major trades
- Ability to read and interpret architectural, structural, and MEP drawings
- Strong analytical skills with attention to detail and accuracy
- Excellent communication skills for presenting schedule information to diverse audiences
- Proficiency in Microsoft Office Suite, especially Excel and PowerPoint for reporting
Preferred Qualifications
- Professional certifications: PSP (Planning and Scheduling Professional), PMP, or equivalent
- Experience scheduling cleanroom construction and ISO-classified environments
- Familiarity with design-build, CMAR, or EPC project delivery methods
- Knowledge of semiconductor manufacturing processes and tool installation sequences
- Experience with schedule delay analysis methodologies (TIA, Windows, Collapsed As-Built)
- Proficiency in additional scheduling tools: Microsoft Project, TILOS, Asta Powerproject
- Background in cost-loaded scheduling and earned value management
- Previous experience as owner's representative for major technology or industrial companies
- Understanding of mechanical completion, commissioning, and startup processes
- Experience with 4D/5D modeling and schedule visualization tools (Synchro, Navisworks)
Technical Competencies
- Advanced P6 schedule development including activity coding, resource loading, constraints, and relationship logic
- Schedule baseline establishment, change management, and version control
- Critical path analysis and near-critical path monitoring (activities with float less than 10 days)
- Schedule compression techniques including fast-tracking and crashing analysis
- Float ownership and management in accordance with contract terms
- Schedule risk analysis including probabilistic scheduling (Monte Carlo simulation)
- What-if scenario modeling and recovery schedule development
- Schedule narrative development explaining variances, trends, and mitigation strategies
- Multi-project scheduling and resource allocation across portfolio
- Integration of procurement of long-lead items and vendor delivery schedules
Key Responsibilities - Semiconductor Specific Understand and schedule the unique sequencing requirements of semiconductor facility construction including:
- Vibration-sensitive areas requiring isolated foundations and specialized construction sequencing
- Cleanroom pressurization cascades and progressive commissioning requirements
- High-purity process utility systems (UPW, CDA, bulk chemicals, specialty gases) with extended procurement and testing
- Electrical infrastructure including substations, medium voltage distribution, and backup power systems
- Process tool delivery, rigging, installation, and qualification protocols
- Environmental control systems requiring extensive testing and certification
- Phased occupancy and operational transitions while construction continues in adjacent areas
Construction Scheduler | Primavera P6 (Expert Level) | P6 EPPM | CPM (Critical Path Method) | Owner’s Representative | Semiconductor Tool Installation Sequencing | Integrated Master Schedule (IMS) | Earned Value Management (EVM) | Schedule Delay Analysis (TIA) | High-Purity Process Utilities | Cleanroom Pressurization Cascades | 4D/5D Modeling (Synchro/Navisworks)
Other offers great for you!
These companies are also looking for great profiles
Easy-Talent
Programme Planner & Scheduler IT (H/F)
Freelance
92400 Courbevoie, France
Hybrid
Skills
6 days ago
Quick apply
Confidentiel
Assistant Administratif Formation (freelance, confidentielle)
Freelance
Paris, France
Onsite, Hybrid
Skills
7 hours ago
Quick apply
Staff and More
CONSULTANT ACHAT PUBLIC – IT - CDI UNIQUEMENT BELLE OPPORTUNITE
Permanent contract
Paris, France
Hybrid, Onsite
Skills
2 hours ago
Quick apply
No company information available.