Principle Perspective Engineering Sdn Bhd
Construction Scheduler
2 months ago
Share this opportunity
Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.
Important information
Contract type:
Permanent
Salary:
MYR 54,000 – MYR 72,000 / year
Location:
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
Work mode:
Onsite
Published on:
28 August 2026
What they need
About the role
As the Construction Scheduler at PPE, you own the programme from the first line of logic to project close-out. You are not a reporter of progress — you are the person who drives it. Your schedule is the single source of truth for every project team member, subcontractor, and client.
Key responsibilities
- Develop the construction method statement covering sequencing, phasing, access, logistics, lifting, and CSA/M&E interfaces before the schedule is drafted
- Build the CPM baseline schedule in Primavera P6 or MS Project, structured by WBS with all logic ties, milestones, agreed buffers, and float management in place
- Present and obtain sign-off on the baseline programme before construction mobilises
- Manage all changes to the baseline through a proper revision and approval process
- Publish 2-week and 4-week look-ahead plans every week, distributed before the weekly planning meeting
- Collect actual progress data from Project Engineers, Site Supervisors, and subcontractors at each update cycle
- Recalculate float and critical path after every update; flag variances before they compound
- Load labour, plant, equipment, and material quantities into the schedule; generate resource histograms
- Produce and update S-curves at key milestones for management and client reporting
- Maintain an interface register linking the programme to procurement lead times, drawing approvals, authority submissions, and subcontractor programmes
About you
- Degree in Civil Engineering, Construction Management, Quantity Surveying, or equivalent
- 3 to 4 years of hands-on scheduling experience in industrial, infrastructure, or heavy construction
- Demonstrated experience building and owning CPM schedules across the full project lifecycle (pre-construction through close-out)
- Experience with multi-discipline projects covering CSA and M&E works is strongly preferred
- Proficient in Primavera P6 — this is the core scheduling tool for this role
- Competent in MS Project as a secondary tool
- Able to construct WBS, logic ties, milestones, resource histograms, and S-curves from scratch
- Familiar with CPM critical path methodology, float management, and earned value concepts
- Understanding of delay analysis techniques (TIA, windows analysis, as-planned vs. as-built)
- Knowledge of EOT processes and claims documentation in a construction context
Other offers great for you!
These companies are also looking for great profiles
Easy-Talent
Programme Planner & Scheduler IT (H/F)
Freelance
92400 Courbevoie, France
Hybrid
Skills
5 days ago
Quick apply
Easy-Talent
Responsable Technique Multi-sites - Dépôts Pétroliers H/F
600
Freelance
91350 Grigny, France
Onsite
Skills
9 hours ago
Quick apply
Avelsen
Data Governance - Freelance
Freelance
Marseille, France
Onsite, Hybrid
Skills
8 hours ago
Quick apply
No company information available.