Find a jobRecruiters

Construction Scheduler

Exclusive opportunity

Onsite

Construction Scheduler

Elmington

Construction Scheduler

17 days ago

Share this opportunity

Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.

Important information


Contract type:

Freelance / Contract

Location:

Nashville, TN, USA

Work mode:

Onsite

Published on:

7 October 2026

What they need


Elmington Construction is a Nashville-based general contractor and construction management company providing comprehensive residential and commercial services with a partnership approach. We specialize in affordable and multi-family housing and have completed 36 projects with 21 more under construction in states across the US.

Our experienced leadership team understands market dynamics and has refined our processes to minimize typical construction conflicts, delivering exceptional results that provide clients confidence and peace of mind throughout their journey with the Elmington family.

All activities will be performed in support of the values of Elmington Construction.

Integrity ~ Precision ~ Growth ~ Driven ~ Relationships

POSITION SUMMARY:

As a Construction Scheduler at Elmington Construction, you will work closely with preconstruction, project management, field management, and our in-house scheduling team, as well as with subcontractors and owners' representatives, to aid in the creation and management of schedules for the company projects.

KNOWLEDGE/SKILLS/ABILITIES:

  • Communication skills
  • Basic mathematical skills
  • Problem solving skills
  • Basic computer skills
  • Knowledge of all facets of ground up construction
  • Attention to detail
  • Ability to manage multiple projects
  • Ability to travel
  • Exceptional verbal and written communication skills to liaise effectively with team members and leadership.
  • Outstanding organizational skills to manage multiple priorities, tasks, and deadlines efficiently.

ESSENTIAL JOB FUNCTIONS:

  • Create and manage detailed project schedules along with project teams' input
  • Work with project teams and leadership to set project goals and analyze the status of the projects
  • Perform analysis on schedules to determine duration and logic issues
  • Work with project teams to update schedules on a bi-weekly basis and report all findings to project teams and leadership
  • Perform impact analysis for potential delays and changes
  • Report overall progress for each project to leadership
  • Manage additional schedulers that will assist in schedule creation, updates, and reporting
  • Visit projects for onsite review of progress
  • Perform / manage associated document distribution
  • Identify ways to provide information to project teams and subcontractors to clearly communicate schedule expectations and impacts
  • Provide guidance to less experienced members of the team
  • Perform additional duties as assigned

The above description covers the principal duties and responsibilities of the job. The description shall not, however, be construed as a complete listing of all miscellaneous, incidental, or similar duties which may be required from day-to-day.

SPECIFIC EDUCATION OR EXPERIENCE:

  • A Degree in Construction Management, Engineering, or related field
  • 3-5 years related construction experience working in similar positions
  • Thorough understanding of critical path method of scheduling
  • Experience using Primavera scheduling software and Microsoft Office products (P6 experience preferred)
  • Familiarity with claims prevention and analysis techniques strongly preferred
  • Ability to conduct constructability reviews for varying construction method/techniques during design or construction

PHYSICAL DEMANDS AND WORK ENVIRONMENT:

  • Frequently sit, stand and walk.
  • Regularly required to talk or hear.
  • Frequently required to use hands or fingers to handle or feel objects, tools or controls.
  • Occasionally lift and/or move up to 25 pounds.
  • The noise level in the work environment is usually moderate.
  • Temperature in the workplace is typically moderate, though the ability to withstand seasonal cold and heat of the outdoors is necessary.

The Elmington Construction Experience

At Elmington Construction, we foster an entrepreneurial mindset, compensating for the value our team members bring to the table. We provide an environment that encourages room for advancement and career succession, recognizing and rewarding contributions to our collective success. With a team collaboration ethos, constant improvement is not just encouraged but embedded in our culture, offering autonomy to individuals who thrive on innovation.

Elmington Construction is an equal opportunity employer that is committed to diversity and inclusion in the workplace. We prohibit discrimination and harassment of any kind based on race, color, sex, religion, sexual orientation, national origin, disability, genetic information, pregnancy, or any other protected characteristic as outlined by federal, state, or local laws.

This policy applies to all employment practices within our organization, including hiring, recruiting, promotion, termination, layoff, recall, leave of absence, compensation, benefits, training, and apprenticeship. Elmington Construction makes hiring decisions based solely on qualifications, merit, and business needs at the time.

Other offers great for you!

These companies are also looking for great profiles

Easy-Talent

Programme Planner & Scheduler IT (H/F)

Freelance

92400 Courbevoie, France

Hybrid

Skills

Project Management (PMO)PMO

4 days ago

Quick apply

Nexoris

Senior Product Manager – Application Mobile B2C / Monétisation & Retail Media

500

Freelance

Paris, France

Onsite, Hybrid

Skills

- Expérience confirmée sur des applications mobiles grand public iOS et Androidavec des fonctionnalités déployées à grande échelle. - Expérience opérationnelle en Retail MediaAd TechMarketplace ou monétisation e-commerceavec responsabilité directe sur un périmètre générateur de revenus et maîtrise de ses indicateurs économiques. - Expérience en environnement Agile Scrum à l’échelleavec plusieurs squads. - Expérience concrète de pilotage produit par la donnée : définition de KPIexpérimentation et exploitation de dashboards. Compétences demandées dans la mission - Modèles publicitaires : placements sponsorisésoffres partenairesciblage et optimisation du rendement publicitaire (yield). - Écosystème Ad Serving et mécanismes de mesure publicitaire. - Consent Management et contraintes RGPD appliquées à la publicité. - Connaissance des produits bancairesFintech ou paiements digitaux (appréciée). - Connaissance des plateformes internationales et des spécificités des marchés locaux (appréciée). - Utilisation d’outils d’intelligence artificielle et connaissance des workflows agentiques appliqués au Product Management (appréciées).

13 hours ago

Quick apply

Futurwork

FinOps Practitioner

€585/day

Freelance

Brussels, Belgium

Onsite, Hybrid

Skills

AzureFinOpsCloud cost optimizationCloud budgeting and forecastingShowback and chargebackFOCUS

13 hours ago

Quick apply

The best place to find your next move

© 2026. All Rights Reserved.

Talents

Find a job

Create a profile

Solutions and tools