Parapex Talent
CSA Project Manager - Data Centre Construction
5 days ago
Share this opportunity
Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.
Important information
Contract type:
Permanent
Work mode:
Onsite
Published on:
21 October 2026
What they need
The Project A major data centre operator is building a long-term programme of new facilities across several sites in Finland. It is hiring people to stay with the programme and take buildings from the ground up, phase after phase. You will lead the civil, structural and architectural (CSA) scope from detailed design through to handover.
What You Will Do
Lead the CSA scope from excavation, piling, foundations and slab through steel frame, roofing and facades to a building ready for equipment install.
Manage the general contractor, civils contractors and subcontractors against programme, quality, safety and cost, and support tender evaluation for major CSA packages.
Challenge contractor methodology, sequencing and logistics before problems reach the critical path.
Review RFIs, shop drawings and design changes, and make the client's call on change and scope.
Coordinate CSA interfaces with mechanical, electrical and commissioning teams so rooms are ready for equipment and energisation.
Run inspections and defect close-out, then hand the completed building over to operations.
What You Will Need
You have managed substructure and structure packages on a large, complex build: excavation, piling, foundations, slab and steel frame.
A contractor background, as a project manager or construction manager on civils or building packages, in data centres, pharma, logistics, industrial or similar.
You have taken a project from pre-construction through to completion and handover.
The ability to challenge a contractor's programme with evidence and keep the working relationship intact.
Willingness to relocate to Finland for a long-term role.
Useful But Not Essential
Data centre or other mission-critical experience.
Previous client-side, developer or owner/operator experience.
A degree in civil or structural engineering or construction management, or PMP, PRINCE2, CIOB, RICS or ICE accreditation.
Relocation Relocation support is provided, but you arrange and pay for your own housing. Candidates from across Europe and the UK are welcome, and visa sponsorship is available for those who need it. We are recruiting on behalf of a confidential client, and your application is handled in confidence.
Other offers great for you!
These companies are also looking for great profiles
skiils
Chef de Projet Data
Entre 40k et 43k max
Permanent contract
Paris, France
Hybrid, Onsite
Skills
10 days ago
Quick apply
Salutech
Chef de projet Data
550
Freelance
Paris, France
Remote, Hybrid
Skills
3 days ago
Quick apply
Unitech Solutions
Chef de projet MOE Data Senior
530€/jour
Freelance
92130 Issy-les-Moulineaux, France
Hybrid
Skills
2 days ago
Quick apply