Find a jobRecruiters

EHS Advisor - Data Centre Construction

Exclusive opportunity

Onsite

EHS Advisor - Data Centre Construction

Designer Group

EHS Advisor - Data Centre Construction

Skills

Compliance

2 months ago

Share this opportunity

Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.

Important information


Contract type:

Permanent

Location:

Hessen, Germany

Work mode:

Onsite

Published on:

31 August 2026

What they need


EHS Advisor (m/f/d) – Data Centre Construction

Location: Germany
Sector: Data Centres / Mission Critical Construction
Employment Type: Full-Time | Site-Based

The Role

Designer Group is seeking an experienced Environmental, Health & Safety (EHS) Advisor to support the delivery of major data centre projects in Germany.

This is a site-based construction safety role working within a fast-paced, highly regulated mission-critical environment.

You will work closely with project management, construction teams, engineers, subcontractors, client representatives and the wider EHS team to maintain high standards of health, safety and environmental performance throughout project delivery.

The role will suit an EHS professional with experience in data centres, M&E construction, building services, industrial, pharmaceutical, semiconductor or other technically complex construction environments.

Key Responsibilities

As EHS Advisor, you will:

  • Support the implementation of the project EHS management system across the construction site.
  • Conduct regular site safety inspections, audits and behavioural safety observations.
  • Identify hazards, unsafe conditions and emerging risks and work with project teams to implement corrective actions.
  • Support compliance with applicable German occupational health and safety legislation, construction-site requirements, DGUV regulations and client EHS standards.
  • Support and review project Gefährdungsbeurteilungen / risk assessments, method statements and safe systems of work.
  • Review subcontractor EHS documentation before mobilisation and throughout project delivery.
  • Support coordination between Designer Group, subcontractors, the client and relevant SiGeKo / safety coordination functions where applicable.
  • Deliver site inductions, toolbox talks, safety briefings and EHS awareness programmes.
  • Support the management of Permit-to-Work processes and high-risk construction activities.
  • Monitor activities including work at height, lifting operations, hot works, confined spaces, temporary works and electrical/mechanical installation.
  • Support safe energisation, isolation and LOTO processes where applicable.
  • Investigate accidents, incidents, near misses and unsafe conditions and support root-cause analysis and corrective actions.
  • Maintain project EHS registers, inspection records, training records and statutory documentation.
  • Monitor subcontractor safety performance and support corrective and preventative actions.
  • Participate in daily coordination meetings, EHS meetings and project safety reviews.
  • Support emergency preparedness, evacuation planning and incident-response arrangements.
  • Track and report EHS KPIs, trends, observations and corrective actions.
  • Promote positive behavioural safety and a proactive safety culture across the project.
  • Support the preparation of EHS documentation required for project completion and handover.

Requirements

What We Are Looking For

Essential

  • Recognised qualification in Occupational Health & Safety, Environmental Health & Safety or a related discipline.
  • Previous EHS experience within construction or engineering environments.
  • Strong practical knowledge of construction-site health and safety.
  • Experience conducting site audits, inspections, risk assessments and incident investigations.
  • Experience working with subcontractors and construction delivery teams.
  • Strong communication and influencing skills.
  • Ability to challenge unsafe practices professionally and constructively.
  • Strong organisational, reporting and documentation skills.
  • Comfortable working within a fast-paced, multicultural construction environment.
  • Good IT skills, including Microsoft Office and digital EHS reporting systems.
  • Professional working proficiency in English.

Highly Desirable

  • Previous data centre / mission-critical construction experience.
  • Experience within a major M&E contractor, general contractor or specialist subcontractor.
  • Experience with high-risk M&E construction activities.
  • Knowledge of German occupational health and safety requirements including ArbSchG, BaustellV and DGUV regulations.
  • German language capability.
  • Previous experience working on construction projects in Germany.
  • Knowledge of Gefährdungsbeurteilung, Permit-to-Work and LOTO systems.
  • Experience working with SiGeKo, client EHS teams and multidisciplinary subcontractors.
  • First Aid qualification.
  • Train-the-Trainer or equivalent training qualification.
  • NEBOSH, IOSH or comparable international safety qualification.
  • Fachkraft für Arbeitssicherheit (Sifa) qualification or recognised German safety training would be advantageous where relevant to the project.

Benefits

Why Join Designer Group?

You will have the opportunity to work on technically complex, high-profile data centre projects as part of an international engineering business experiencing continued growth across Europe.

Designer Group offers:

  • Exposure to major international data centre projects.
  • Long-term career and professional development opportunities.
  • A strong safety-first culture.
  • International and multidisciplinary project teams.
  • Continuous learning and development.
  • Opportunities for progression as our European operations continue to grow.
  • A competitive remuneration package aligned with experience and project requirements.

Interested?

If you are an EHS professional with construction experience and want to develop your career within the rapidly growing European data centre sector, we would like to hear from you.

Apply today to join Designer Group and help us deliver major mission-critical projects safely, efficiently and to the highest industry standards.

Designer Group is committed to equal opportunities and welcomes applications from suitably qualified candidates regardless of gender, age, disability, ethnic origin, nationality, religion or belief, sexual orientation or any other characteristic protected by applicable law.

INDMP

#LI-CH1

Other offers great for you!

These companies are also looking for great profiles

FreelanceRepublik

Data engineer

Freelance

Paris, France

Hybrid

Skills

Snowflake DBT PipelinesMigration Dataiku DBTData Engineering IA

8 hours ago

Quick apply

skiils

Data Scientist

Permanent contract

Paris, France

Onsite, Hybrid

Skills

Google Cloud PlatformSQL QueriesData ScienceGoogle BigQueryUser analyticsData manipulation

5 hours ago

Quick apply

KatchMe

Freelance Data Engineer - Assurance

350 à 400€/jour

Freelance

Paris, France

Hybrid

Skills

MongoDBData EngineeringETLPostgreSQLData modelingBusiness intelligence

4 hours ago

Quick apply

The best place to find your next move

© 2026. All Rights Reserved.

Talents

Find a job

Create a profile

Solutions and tools