AG Staffing Malaysia
Electrical Project Mgr | Substation Electrical Mgr (Data Centre Construction) JB
Skills
2 months ago
Share this opportunity
Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.
Important information
Contract type:
Permanent
Salary:
MYR 144,000 – MYR 216,000 / year
Location:
Johor Bahru, Johor, Malaysia
Work mode:
Onsite
Published on:
20 August 2026
What they need
Position 1: Electrical Project Managers - Data Centre Construction - JB
Position 2: Substation Electrical Managers - Data Centre Construction - JB
Position 3: Electrical Project Managers- Extra Low Voltage (ELV) - Data Centre Construction - JB
Position 1: Electrical Project Managers (Data Centre Construction) - PMC - JB
Key Responsibilities
1. Technical Execution & Engineering Oversight
- System Delivery: Oversee the installation of 132kV/33kV sub-stations, MV/LV switchgear, step-down transformers, UPS systems (2N/N+1), backup diesel generators, busduct tracks, and specialized clean earthing systems.
- Design Review: Evaluate Single-Line Diagrams (SLDs), shop drawings, containment layouts, and engineering calculations to resolve technical clashes before construction begins.
- Cooling Integration: Coordinate power distribution modifications required for high-density IT racks, including transition paths from traditional air cooling to liquid/direct-to-chip cooling architectures.
2. Project Planning & Procurement
- Schedule Management: Develop and manage detailed electrical work packages, tracking milestones via MS Project or Primavera P6 to hit strict Ready-for-Service (RFS) deadlines.
- Long-Lead Tracking: Monitor the manufacturing and delivery of long-lead equipment (e.g., UPS, generators, transformers) to prevent critical path site delays.
- Subcontractor Management: Supervise electrical subcontractors, evaluate progress claims, and manage variation orders (VOs) alongside the commercial team.
3. Regulatory Compliance, Quality & Safety
- Utility Coordination: Liaise directly with Tenaga Nasional Berhad (TNB) and Suruhanjaya Tenaga (ST) for grid interconnection, testing approvals, and energization clearance.
- Statutory Submissions: Work closely with the appointed ST-certified Competent Electrical Engineer to secure legal sign-offs, including Form G and Form H approvals.
- Site Safety: Enforce strict Lock-Out, Tag-Out (LOTO) systems, High Voltage testing permits, and risk assessment strategies (RAMS) in compliance with CIDB and DOSH guidelines.
Position 2: Substation Electrical Managers (Data Centre Construction) - PMC - JB
Key Responsibilities
A Substation Senior Electrical Manager for data centre construction leads the high-voltage power supply, grid connection, and on-site substation infrastructure. Key duties include managing high-voltage (HV/EHV) design, coordinating utility grid integration, and overseeing site installation and safety compliance.
Core Responsibilities
- Grid Integration: Manage high-voltage and extra-high-voltage (HV/EHV) power connections with local utility providers.
- Design & Engineering: Oversee layout and technical specifications for transformers, switchgears, and protection systems.
- Project Delivery: Monitor project schedules, budgets, and contractor performance from construction to final testing.
- Safety & Compliance: Ensure all electrical installations meet local grid codes and international mission-critical safety standards.
Preferences
Education: Bachelor’s degree in Electrical Engineering.
Technical Skills: Deep expertise in high-voltage substations, power distribution, and mission-critical backup systems.
Position 3: Electrical Project Managers- Extra Low Voltage (ELV) - Data Centre Construction - PMC - JB
Key Responsibilities
1. Mission-Critical System Delivery & Integration
- Security & Access Control: Oversee the deployment of high-tier physical security infrastructure, including biometric access control systems, physical access control systems (PACS), anti-tailgating mantraps, turnstiles, and perimeter intrusion detection systems (PIDS).
- CCTV & Video Analytics: Manage the installation of comprehensive high-definition IP-CCTV networks with advanced video analytics for data hall monitoring, fence-line surveillance, and absolute tracking of physical asset movements.
- BMS & EPMS Integration: Lead the deployment of the Building Management System (BMS) and Environmental/Electrical Power Monitoring System (EPMS) to track temperature, humidity, leakages, and power metrics across the facility.
- Structured Cabling: Supervise the installation of optical fiber and copper backbone/horizontal cabling systems, including overhead or underfloor cable pathways, splicing, and server room patch frames.
2. Life Safety & Environmental Protection
- Early Warning Fire Detection: Manage the installation of Very Early Smoke Detection Apparatus (VESDA / Aspirating Smoke Detection) systems to identify structural hazards before open flames erupt.
- Interlocking Controls: Coordinate complex logical trip matrices between the fire alarm system, gaseous fire suppression systems, mechanical smoke extraction fans, and electrical door release controls.
3. Coordination, Software Calibration & Procurement
- BIM & Cable Route Control: Utilize Building Information Modeling (BIM) to map dedicated ELV containment paths, avoiding electrical interference (EMI) from high-voltage busducts and cabling.
- Software Commissioning: Oversee the programming, GUI design, network switch configurations, and software integration of different ELV components into a centralized master control room.
- Vendor & Subcontractor Tracking: Manage specialized specialized vendors and ELV subcontractors, verifying progress claims and strictly vetting variation orders (VOs).
Other offers great for you!
These companies are also looking for great profiles
Weco Technology
Chef de projet SI senior / Scrum Master – Migration téléphonie et centre de cont
Freelance
Paris, France
Hybrid
Skills
1 day ago
Quick apply
Wikeys
Analyste-Testeur / Software Test Analyst – Seniorité confirmée | Bruxelles
Freelance
Brussels, Belgium
Hybrid
Skills
20 hours ago
Quick apply
Mon Consultant Indépendant
Consultant Senior contrôle permanent & risques opérationnels | Asset management
TJM HT max 581 € (hors éventuels frais de mission, à discuter avec le client)
Freelance
Paris, France
Hybrid
Skills
16 hours ago
Quick apply