Find a jobRecruiters

FACADE & CLADDING SURVEYOR

Exclusive opportunity

Onsite

FACADE & CLADDING SURVEYOR

Highpoint Property Ventures

FACADE & CLADDING SURVEYOR

Skills

Compliance

24 days ago

Share this opportunity

Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.

Important information


Contract type:

Permanent

Location:

Cebu City, 6000 Cebu, Philippines

Work mode:

Onsite

Published on:

2 October 2026

What they need


End-to-End Operational Process Flow & Core Responsibilities

A. Pre-Installation Survey & As-Built Verification

·         Grid Line & Datum Establishment: Transfer and verify main gridlines, centerlines, and benchmark elevations (FFL/SSL) from the main contractor to establish primary control points for the facade system.

·         Civil Structure As-Built Mapping: Perform comprehensive 3D dimensional surveys of cast-in-place concrete, steel beams, slab edges, and structural openings. Reconcile actual civil construction tolerances against approved architectural shop drawings.

·         Deviation Reporting & CAD Coordination: Identify out-of-plumb walls, slab edge variances, or structural obstructions early. Produce detailed as-built survey drawings and coordinate with CAD draftspersons to adjust embedded plate/bracket details before factory fabrication.

B. Bracket Setting & Facade Erection Layout Control

·         Bracket & Anchor Setting Control: Mark precise location layout points on concrete/steel structures for embedded plates, anchor bolts, and bracket supports for unitized/stick curtain wall systems and Aluminum Composite Panels (ACP).

·         Vertical Plumbness & Level Alignment Checks: Monitor structural alignment during bracket installation, mullion erection, and unitized glass panel hanging. Ensure strict compliance with structural verticality, horizontal levelness, and joint gap tolerances.

·         3D Scanning & Point Cloud Processing: Operate 3D laser scanners and total stations to capture point cloud data for complex curved, inclined, or double-skin glass/aluminum facades.

C. Post-Installation Verification & Handover Documentation

·         Final As-Built Survey Documentation: Conduct post-installation survey checks on installed curtain wall profiles, glass units, and cladding panels. Generate final as-built drawings for consultant approval and main contractor turnover.

·         Instrument Calibration & Survey Records: Maintain, calibrate, and care for all optical and digital surveying instruments (Total Station, Digital Level, Laser Distance Meters). Keep complete, auditable field survey books and log files.

Other offers great for you!

These companies are also looking for great profiles

Achil

Gestionnaire de Paie & Comptable H/F – Ballainvilliers (91)

Permanent contract

95130 Franconville, France

Onsite

14 hours ago

Quick apply

Yunik

Expert Senior Transformation Finance & AI First / Process Redesign

Freelance

Paris, France

Hybrid

Skills

Intelligence ArtificielleIA générativeAgentiqueTransformation FinanceBusiness Process Reengineering (BPR)Intelligent AutomationTarget Operating Model (TOM)Comptabilité & Reporting réglementaire

7 hours ago

Quick apply

Yunik

Tech Lead IA Agentique / RAG – Azure & Python

Freelance

Paris, France

Hybrid

Skills

LLMs / Large language modelsPythonAzureIA AgentiqueRAGArchitecture IA

7 hours ago

Quick apply

The best place to find your next move

© 2026. All Rights Reserved.

Talents

Find a job

Create a profile

Solutions and tools