INSPUR COMMUNICATION MALAYSIA SDN. BHD.
Fire Protection Engineer – Data Centre Construction Project
24 days ago
Share this opportunity
Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.
Important information
Contract type:
Permanent
Location:
Cyberjaya, Selangor, Malaysia
Work mode:
Onsite
Published on:
30 September 2026
What they need
About the role
Manage and coordinate fire protection system installation and construction works for data centre projects. Review fire protection drawings, specifications, material submissions, method statements, and shop drawings. Coordinate with contractors, consultants, and other engineering teams to ensure smooth project execution. Monitor on-site installation, testing, commissioning, and rectification of fire protection systems. Conduct site inspections to ensure workmanship and fire protection systems comply with project requirements and relevant standards. Prepare and maintain inspection records, testing reports, progress reports, and other project documentation.
Key responsibilities
- Manage and coordinate fire protection system installation and construction works for data centre projects
- Review fire protection drawings, specifications, material submissions, method statements, and shop drawings
- Coordinate with contractors, consultants, and other engineering teams to ensure smooth project execution
- Monitor on-site installation, testing, commissioning, and rectification of fire protection systems
- Conduct site inspections to ensure workmanship and fire protection systems comply with project requirements and relevant standards
- Prepare and maintain inspection records, testing reports, progress reports, and other project documentation
About you
- Bachelor's degree or above in Fire Engineering, Mechanical Engineering, Electrical Engineering, or a related field
- 3+ years of relevant experience in fire protection engineering or construction projects
- Experience in data centre construction projects is highly preferred
- Good knowledge of fire protection systems, including fire alarm, fire suppression, sprinkler, hydrant, and related systems
- Good communication, coordination, and problem-solving skills, with the ability to work effectively on construction sites
- Proficiency in Chinese is an advantage, especially for communication with Chinese-speaking project teams
Other offers great for you!
These companies are also looking for great profiles
Nigel Frank
Data Engineer - Contract
Freelance
Remote
Skills
20 hours ago
Quick apply
Skill Now
Data Engineer Senior
55K
Permanent contract
Saint-Denis, France
Hybrid
Skills
17 hours ago
Quick apply
Skill Now
Consultant Fonctionnel Data Protection - Freelance ou CDI
500€/jour
Freelance
92150 Suresnes, France
Hybrid
Skills
16 hours ago
Quick apply