Find a jobRecruiters

HVAC Site Engineer (Data Center Construction)

Exclusive opportunity

Onsite

HVAC Site Engineer (Data Center Construction)

Branch of Sterling and Wilson Data Center Private

HVAC Site Engineer (Data Center Construction)

Skills

Testing & QACompliance

23 days ago

Share this opportunity

Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.

Important information


Contract type:

Permanent

Location:

Riyadh Saudi Arabia

Work mode:

Onsite

Published on:

30 September 2026

What they need


  1. Supervise and execute HVAC works as per approved drawings, specifications, method statements and project schedule.
  2. Manage installation of AHUs, FCUs, CRAC/CRAH units, chillers, pumps, cooling towers, ducting, piping, valves and associated equipment.
  3. Review IFC/shop drawings and coordinate with Civil, Electrical, Plumbing, Firefighting, ELV and BIM teams to resolve clashes and interfaces.
  4. Monitor HVAC subcontractors, manpower, materials, productivity and daily progress.
  5. Ensure proper installation of ducting, chilled-water piping, insulation, supports, equipment and associated services.
  6. Coordinate pressure testing, flushing, duct leakage testing, TAB and testing & commissioning activities.
  7. Ensure compliance with approved method statements, ITPs, QA/QC and HSE requirements.
  8. Raise/close WIR/IR, NCRs, punch points and inspection observations.
  9. Support HVAC pre-commissioning, commissioning and integrated testing, particularly for critical Data Center systems.
  10. Maintain progress reports, testing records, as-built drawings and handover documentation.

Desired Candidate Profile

  1. Diploma/B.E./B. Tech in Mechanical Engineering / HVAC / relevant discipline.
  2. 6–10 years of relevant HVAC site execution experience.
  3. Data Center / Mission Critical / Large EPC project experience preferred.
  4. Strong knowledge of HVAC installation, chilled-water systems, ventilation and critical cooling systems.
  5. Experience with CRAH/CRAC units, chillers, cooling towers, pumps and associated controls preferred.
  6. Good understanding of ASHRAE standards, project specifications and applicable codes.
  7. Ability to read IFC, shop and MEP coordination drawings.
  8. Experience in subcontractor and site execution management.
  9. Proficiency in AutoCAD; BIM/Navisworks/Revit knowledge is an advantage.
  10. Strong coordination, problem-solving and site management skills.

Other offers great for you!

These companies are also looking for great profiles

Cherrypick

Site reliability Engineer (SRE)

550e/jour

Freelance

Paris, France

Hybrid

Skills

GrafanaAWSKubernetesLinux/UnixCI/CD

3 days ago

Quick apply

Futurwork

Data center Network Architect

700 - 750€

Freelance

Brussels, Belgium

Hybrid

Skills

KubernetesAsanaAzurecisco aci

10 hours ago

Quick apply

Mobiskill

AI Engineer

500

Freelance

Paris, France

Hybrid

Top Recruiter

Skills

LLMs / Large language modelsPythonAI Engineer

10 hours ago

Quick apply

The best place to find your next move

© 2026. All Rights Reserved.

Talents

Find a job

Create a profile

Solutions and tools