TeamLINX
Low Voltage Technician | Structured Cabling | Data Center Construction
Skills
2 months ago
Share this opportunity
Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.
Important information
Contract type:
Permanent
Salary:
$43,680 – $58,240 / year
Location:
Salt Lake City, UT, USA
Work mode:
Onsite
Published on:
28 September 2026
What they need
Job Summary:
Low voltage technicians work in a team environment to meet project objectives. They must have a great attitude, be dependable, willing to learn and take directions and are reliable on the job site. In this role you will be completing both ISP and OSP work.
About LINX:
Join a team that connects people through technology. We design, install, and support commercial network cabling for data centers, multimedia, security, and wireless systems.
In 2003, industry experts founded LINX to create the workplace they wanted—one built on integrity, teamwork, and innovation. These core values drive us daily, shaping a culture where employees grow and take pride in their work.
Headquartered in Denver, CO, with regional offices in Seattle, WA; Salt Lake City, UT; San Antonio, TX; Atlanta, GA; Cheyenne, WY; and Des Moines, IA, we’re growing fast! With AI, remote work, and digital transformation accelerating, now is the time to build your future with LINX.
Where This Role Fits at LINX
Technician Lead Technician Foreman Superintendent Project Manager Senior Project Manager Operations Manager
Essential Duties and Responsibilities
Install, terminate, and test structured cabling systems for CAT5e, CAT6, CAT6a, fiber optic, and coaxial cables, ensuring proper documentation and compliance with industry standards.
Build, install, and maintain MDFs and IDFs, including racks, patch panels, wire management systems, and network hardware, while troubleshooting low voltage cable systems.
Perform cable pulling, suspension, fireproofing, termination, and testing in accordance with BICSI standards, NEC, and local regulations to ensure safety and compliance.
Deliver exceptional customer service, maintain professionalism and strong communication skills to resolve technical issues and provide solutions.
Ensure high-quality, organized, and professional workmanship on all installations to meet project specifications and exceed customer expectations.
Travel to job sites anywhere within your state, may also be required to travel within the USA
Minimum Requirements
Tech 1:
Must be able to work on ladders and use power tools; ability to lift/carry/setup a 50-pound box or ladder
Must own low voltage tools (strippers, screwdrivers, wrenches)
Able to work 2nd/3rd shift, overtime, and under pressure.
Must pass a 7-year background check, drug screen, and physical.
Requires valid driver’s license, reliable transportation, and insurance
Commercial construction experience preferred
Tech 2:
All above requirements plus a minimum 2 years of commercial low voltage installation experience
Able to terminate a jack, pull cable and “work a 90” proficiently with limited supervision
Can install, terminate, and test structured cabling systems forCAT5e, CAT6, CAT6a, fiber optic, and coaxial cables proficiently
Ability to build out MDF and IDF closets including racks, patch panels, wire management systems, and network hardware with supervision
Tech 3:
All above requirements plus a minimum of 3 years of commercial low voltage installation experience
Able to terminate a jack, pull cable and “work a 90” proficiently with no supervision
Can install, terminate, and test structured cabling systems for CAT5e, CAT6, CAT6a, fiber optic, and coaxial cables with no supervision
Ability to build out MDF and IDF closets including racks, patch panels, wire management systems, and network hardware with no supervision
Professional working proficiency in English
Preferred Experience (not required)
BICSI Technician or Installation Certification
Powder Actuated Tools Certification
Confined Space Certification
CPR and First Aid certified
Manufacturers certifications for Installation and Maintenance
High School Diploma
Pay Rate:
Tech 2: $21.00 - $25.00/hour
Tech 3: $23.00 - $28.00/hour
TEAMLINX offers great benefits including:
401K with 50% employer match up to first 5%
Insurance options including medical plans with Flexible Spending and/or Health Savings Accounts, Disability, Dental and Vision
8 Paid Holidays
3 weeks Paid Time Off (PTO) combining sick pay and vacation days
Career growth opportunities
Posting Deadline:
This role will be posted until filled and may close without notice.
We are an Equal Opportunity Employer and value diversity in the workplace. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, veteran status, or any other protected characteristic.
Benefits:
- 401(k)
- 401(k) matching
- Dental insurance
- Employee assistance program
- Health insurance
- Health savings account
- Life insurance
- Paid time off
- Referral program
- Vision insurance
Language:
- English (Required)
- Spanish (Preferred)
Willingness to travel:
- 100% (Preferred)
Other offers great for you!
These companies are also looking for great profiles
Celad
Data Scientist (H/F)
45 000 / 50 000 K€
Permanent contract
92210 Saint-Cloud, France
Hybrid
Skills
3 hours ago
Quick apply
FreelanceRepublik
Data engineer
Freelance
Paris, France
Hybrid
Skills
3 hours ago
Quick apply
Job Connect Maroc
Comptable – Marchés publics & Import | Takkadom
Permanent contract
Rabat, Morocco
Onsite
Skills
33 minutes ago
Quick apply