Find a jobRecruiters

Safety Coordinator – Data Center Construction

Exclusive opportunity

Onsite

Safety Coordinator – Data Center Construction

TeamLINX

Safety Coordinator – Data Center Construction

Skills

ADP Workforce NowComplianceRegulatory Compliance

11 days ago

Share this opportunity

Share this opportunity to other talents of your network:
✓ Offer them a visibility boost with clients.
✓ Help your contacts find their next job.

Important information


Contract type:

Permanent

Salary:

$35 – $45 / hour

Location:

Denver, CO, USA

Work mode:

Onsite

Published on:

17 October 2026

What they need


Travel Requirement: 100% full-time travel to (Project Location) covering project sites nationwide. All travel expenses covered by the company and per diem is paid.

LINX is hiring a Safety Coordinator to maintain a daily on-site safety presence across active hyperscale data center construction projects nationwide, paying $35.00 to $45.00 an hour.

You'll be the safety authority on the ground: writing Job Hazard Analyses and Pre-Task Safety Analyses, running site inspections, investigating incidents, and training crews on the standards that keep a live construction site compliant. You report to the Safety Manager and work directly with Project Managers and crews to keep safety built into daily operations, not bolted on after the fact.

Where This Role Fits at LINX

Safety Coordinator Safety Manager Director of Safety.

Safety Coordinators who build a strong compliance record and demonstrate team leadership are the direct pipeline into Safety Manager roles as LINX's hyperscale project volume grows.

What You'll Be Doing

Safety Program Management

  • Implement and maintain safety policies, procedures, and programs specific to data center construction
  • Create and manage Job Hazard Analyses (JHA) and Pre-Task Safety Analyses (PTSA) for active work scopes
  • Maintain a daily on-site presence during normal construction hours

Compliance & Inspection

  • Ensure adherence to OSHA and local safety regulations, and conduct regular job site inspections
  • Monitor proper PPE usage and ensure safety equipment is maintained and available

Incident Response

  • Investigate accidents, near-misses, and hazards, and recommend corrective actions
  • Serve as the primary safety contact on site, reporting incidents and maintaining documentation

Training & Collaboration

  • Provide safety training and ensure workers meet required certifications before starting work
  • Work directly with Project Managers and crews to integrate safety into daily operations

Minimum Requirements

  • 5+ years of relevant safety experience in construction

  • OSHA 30 certification

  • Bachelor's degree in Safety or one of the following certifications: STSC (Safety Trained Supervisor for Construction), CHST (Construction Health and Safety Technician), or CSP (Certified Safety Professional)

  • Ability to proficiently develop a Job Hazard Analysis (JHA) and Pre-Task Safety Analysis (PTSA)

  • Proven experience in on-the-job safety adherence and regulatory compliance

  • Effective written and verbal communication skills

  • Highly structured with strong attention to detail

  • Available for 100% travel to project sites nationwide (all travel expenses covered)

  • Valid driver's license, auto insurance, and ability to pass a background check and drug screen

This Role Is Probably Not Right For You If

  • You've never written a JHA or PTSA, or run a site safety inspection yourself, this isn't an entry point into construction safety
  • You're not comfortable being on the road constantly — this is a 100% travel position with typical trips home about once a month while a project is active

Preferred (Not Required)

  • Bachelor's degree in Safety, Occupational Health, Construction Management, or a related field
  • OSHA 510 or OSHA 500
  • STSC (Safety Trained Supervisor for Construction) and/or CHST (Construction Health and Safety Technician)
  • NFPA 70E
  • Fall Protection Competency
  • Confined Space Competency
  • Bilingual, English and Spanish
  • Experience in active data center operations
  • Practical experience in network cabling, termination, and closet builds
  • Ability to read construction drawings and implement cabling pathways

Compensation & Benefits

Pay Rate: $35.00 to $45.00/hour, depending on experience

Benefits:

  • 401(k) with 50% employer match on the first 5% contributed
  • Medical, dental, and vision insurance with FSA and HSA options
  • 8 paid holidays
  • 3 weeks PTO (vacation and sick combined)
  • Per diem for all travel expenses
  • All travel expenses covered
  • Career growth opportunities, including a defined path to Safety Manager

About LINX

Founded in 2003 by working industry practitioners, LINX has grown from a single Denver office into a national commercial low voltage contractor, with active hyperscale data center projects around the country.

Safety is treated as a core discipline on every hyperscale build, not a checkbox. As our data center pipeline keeps growing, Safety Coordinators who build a strong compliance record have a real, defined path into Safety Manager roles.

Equal Opportunity Statement

We are an Equal Opportunity Employer and value diversity in the workplace. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, veteran status, or any other protected characteristic under applicable law.

Posting Deadline

  • This job posting is open until filled and may close at any time without notice.

Other offers great for you!

These companies are also looking for great profiles

Visian

Data Engineer (Expert Data & Référentiels)

600

Freelance

Paris, France

Hybrid

Skills

Data EngineeringSnowflakeDatabricksRéférentiels financiersAsset Management

19 hours ago

Quick apply

Time2scale

Consultant Gouvernance Data - Finance et Risques

Freelance

Paris, France

Onsite

Skills

BCBS 239RDARRData governanceData lineageData qualityBanking finance and risk

18 hours ago

Quick apply

Mon Consultant Indépendant

Consultant fonctionnel data migration sap s/4hana – pp master data manufacturing

TJM HT max 709 € (hors éventuels frais de mission, à discuter avec le client)

Freelance

Paris, France

Hybrid

Skills

SAP

15 hours ago

Quick apply

The best place to find your next move

© 2026. All Rights Reserved.

Talents

Find a job

Create a profile

Solutions and tools