
Adnen DHAHRI
Product Owner | Scrum Master
Salaire / Taux journalier
92410 Ville-d'Avray, France
Freelance
Peut venir sur site
Expertises
Langues
À propos
Introduction
Product Owner & Scrum Master with 7+ years expertise in automotive digital transformation at Renault. Specialized in telematics systems, BI solutions for connected cars, and agile delivery optimization. Expert in backlog management, stakeholder alignment, and driving measurable business outcomes through data-driven product strategies.
Expérience de travail
Renault Digital
juil. 2021 - Présent
5 ans 4 mois
92100 Boulogne-Billancourt, France
ABA / Scrum Master
mars 2023 - Présent
3 ans 8 mois
92100 Boulogne-Billancourt, France
Managing Product Backlog for a Telematics Service Provider Information System
Product Owner Data
juil. 2021 - mars 2023
1 an 9 mois
92100 Boulogne-Billancourt, France
Managing the Product Backlog for a Business Intelligence solution providing KPIs around connected cars services. Roles : Agile Business Analyst, Scrum Master & part of Product Lead reaponsabilities
Groupe Renault
août 2019 - juil. 2021
2 ans
92350 Le Plessis-Robinson, France
Product Owner (Consultant @ Expleo)
mars 2020 - juil. 2021
1 an 5 mois
92350 Le Plessis-Robinson, France
Proxy Product Owner (Consultant @ Expleo)
août 2019 - mars 2020
8 mois
Technocentre Renault -1 Avenue du Golf, 78280 Guyancourt
As a Project Management Engineer on behalf of Renault Group, I am devoted to work with multiple discipline project teams, IT security leader and legal advisors in order to provide high quality procedures that meet the GDPR standard requirements and deliver detailed reports to the project managers. • Designed and improved a project dashboard with reliable KPIs. • Project management based on risk approach • Providing support to customers all along the compliance process and stake in conformity in order to obtain the GDPR compliance certificate. • Gathered data about project progress, status of milestones, goals reached by centralizing information and supporting a balanced scorecard for projects • Made project plans, reviews, templates and documentation widely available to concerned members • Enabled team efficiency by facilitating collaborative knowledge transfers between departmental project teams. • Audited projects in a program and profiles feasibility on the grounds of time, data, costs and resources needed. • Developed training tools patterns and established useful guidelines and framework for all middle-level managers and departmental teams to adhere to.
DevOps Trainee
IMIDDLEWARE
mars 2019 - juil. 2019
5 mois
78300 Poissy, France
DevOps Pipeline Technologies work-study contract : - Agile SCRUM, KANBAN : work within a aglie scrum environment - Git, GitHub : version control, perform all kinds of operations to fetch data from the central server or push data to it - Java, Maven : project object model (POM) to manage a project's build, reporting and documentation - Nexus : proxy, collect, and manage dependencies - SonarQube : Defined Static Code Analysis rules to catch bugs and vulnerabilities - Jenkins : build, test, and deploy software (𝘾𝙄) - Docker : launch applications in software containers (microservices)
PMO / Business Analyst
Altran
juil. 2018 - mars 2019
9 mois
Tunis, Tunisie
❶ Duties as PMO on behalf of #𝗕𝗼𝘀𝗰𝗵 and #𝗖𝗼𝗻𝘁𝗶𝗻𝗲𝗻𝘁𝗮𝗹 - Participated in drafting of the project management plan; WBS and all related documentations - Ensured troubleshooting problems and flaws in the software provided for testing (𝟖𝘿, 𝟓𝙈, 𝙎𝙤𝙣𝙖𝙧𝙌𝙪𝙗𝙚…) - Monitored performance indicators for deliverables, and conduct analysis meetings (𝙌𝙍𝙌𝘾 meetings and 𝙎𝘾𝙍𝙐𝙈 daily meetings) - Prepared reports by collecting, analyzing, and summarizing data and making recommendations to ensure the continuous improvement. - Monitored project performance through PBS, KPIs, Logic Network (𝙅𝙄𝙍𝘼 Atlassian) - Project management based on risk approach ❷ Duties as a Continuous Improvement Engineer within Altran - Contributed to the establishment of Quality Management System for the automotive, aeronautics, security and media sectors consistent with universal standards: 𝙄𝙎𝙊 𝟗𝟎𝟎𝟏:𝟐𝟎𝟏𝟓, 𝙀𝙉 𝟗𝟏𝟎𝟎:𝟐𝟎𝟏𝟔, 𝘼𝙐𝙏𝙊𝙈𝙊𝙏𝙄𝙑𝙀 𝙎𝙋𝙄𝘾𝙀 and 𝙄𝘼𝙏𝙁 𝟏𝟔𝟗𝟒𝟗:𝟐𝟎𝟏𝟔 - Created and maintained company's documentation such as quality manuals, risk tracking forms and quality procedures. - Participated in the establishment of the 𝘿𝙚𝙫𝙊𝙥𝙨 𝙋𝙞𝙥𝙚𝙡𝙞𝙣𝙚 (gained basic knowledge with 𝗖𝗜/𝗖𝗗: 𝙈𝙖𝙫𝙚𝙣, 𝙂𝙞𝙩, 𝙂𝙞𝙩𝙃𝙪𝙗, 𝙉𝙚𝙭𝙪𝙨, 𝙎𝙤𝙣𝙖𝙧𝙌𝙪𝙗𝙚, 𝙅𝙚𝙣𝙠𝙞𝙣𝙨, 𝘿𝙤𝙘𝙠𝙚𝙧)
Continuous Improvement / Project engineer
BIC
janv. 2018 - juil. 2018
7 mois
Boulogne-sur-Mer, France & Bizerte, Tunisie
𝗠𝗶𝘀𝘀𝗶𝗼𝗻: Responsible for the implementation of an integrated Socio-Technical System (BIC MANUFACTURING SYSTEM) & point of contact with Boulogne sur mer Branch ▶ Project 1: Implementation of the problem-solving tool QRQC at both Strategic and operational levels - Development of standardized documentations for the implementation of quality problem solving procedures - Establishment of a structured and dynamic management and coaching system - Ensure the training of staff until mastery of the process - Elaborated Lesson learned Cards - Coordinated between all company departments (logistics, production, quality, continuous improvement and maintenance) - Reduction of average time problem solving (Gain up to 53%) ▶ Project 2: Improvement and optimization of production capacity by KANBAN and SMED methods - Reduced machine downtime SMED + FMECA (Time saving 360min per week) - Brainstormed along with my team members solutions for the uncontrolled safety measures - Reduction of intra-station production stockpiling (Just in Time with Kanban) - Elaborated an autonomous level 1 maintenance range for all machines. ▶ Project 3: Optimization and organization the work area through: - Ensure the organization, cleanliness and safety of the workplace establishing and optimizing a 5S project (Average time saving: 37 min/shift per day): achieved more work with fewer resources - Warehouse stocks management using ABC method to reduce the stocks (Gain in space of 40%). - Workspace adjustment using the KUSIAK and chains method (48.8% gain in course time). ▶ Project 4: Implantation of visual management and improvement of work ergonomics - Implemented dashboards: Business Plan Deployment in both “tactical” and “operational” levels - Improved the visual management of the different projects (Safety, Delivery, Quality, Costs) - Improved working conditions at the injection stations and assembly stations (gain in efficiency by 21.6%).
Yazaki Component Technology
janv. 2017 - oct. 2017
10 mois
Bizerte, Tunisie
Quality Engineer
juin 2017 - oct. 2017
5 mois
Bizerte, Tunisie
𝗠𝗶𝘀𝘀𝗶𝗼𝗻: Improve the Overall Equipment Effeciency (OEE) in a production line - Reduced non-conformities rate in order to achieve total quality and particularly improve the efficiency of a welding workplace and the B-SUV line generally. - Conducted diagnosis and analysis using the Value Stream Mapping (VSM) tool - Implemented Lean methods such as FMEA, SMED and ISHIKAWA Diagram based on jobsite data - Optimized workplace layout and materials flowusing King & Kuziak (11.8% gain in Lead-time) - Implemented a project dashboard using key performance indicators (efficiency, Total Line Reject (TLR), Efficiency)
Continuous Improvement Engineer
janv. 2017 - mai 2017
5 mois
- Improved the DPM indicator of the inversion defect in the assembly line using the 𝙎𝙞𝙭 𝙎𝙞𝙜𝙢𝙖 𝙢𝙚𝙩𝙝𝙤𝙙𝙤𝙡𝙤𝙜𝙮 up to 70%. - Increased the 𝙨𝙞𝙜𝙢𝙖 𝙡𝙚𝙫𝙚𝙡 from 𝟯,𝟴𝟱 to𝟯,𝟵𝟮. - Improved the visual management and workspace ergonomics - Standardize solutions for other projects 𝗣𝗿𝗼𝗰𝗲𝗱𝘂𝗿𝗲 𝗳𝗼𝗹𝗹𝗼𝘄𝗲𝗱: ➊ 𝘿𝙚𝙛𝙞𝙣𝙚 : project charter, problem identification with QQOQCP method, CTQ identification, SIPOC diagram ➋ 𝙈𝙚𝙖𝙨𝙪𝙧𝙚 : Identification of the Y process, validation of the measurement system, Stability study, Capability study, Calculation of sigma level, timekeeping and calculation of TAKT TIME, Ergonomic study of the workstations, Hunting for wastes, ➌ 𝘼𝙣𝙖𝙡𝙮𝙯𝙚 : Cause Identification, ISHIKAWA Diagram, Voting Matrix, root causes ➍ 𝙄𝙣𝙣𝙤𝙫𝙖𝙩𝙚 :Weighting matrix, solutions and action plan (correction and contingency) ➎ 𝘾𝙝𝙚𝙘𝙠: Validation of measurement system, followed by inversion faults, Re-measurement of performance indicators, simulation gives low efficiency ➏ 𝙎𝙩𝙖𝙣𝙙𝙖𝙧𝙙𝙞𝙯𝙚 :standardized solutions for similar projects
Formation
Trailhead by Salesforce
2019 - Présent
7 ans 10 mois
University of Maryland
Professional Certificate
2019 - 2020
2 ans
ENIB - École Nationale d'Ingénieurs de Bizerte
Lean Management & Lean manufacturing Engineer
2015 - 2018
4 ans