Eddy Mabillon

Maintenance/Project/Industrial/Operation/Plant Director

Salaire / Taux journalier

38330 Saint-Ismier, France

Freelance, ouvert au CDI

Expertises

Test & QAGestion des risquesGestion des contratsConduite du changementGestion de la supply chainAchatsNégociation

À propos

Introduction

Driving Excellence: Supporting Organizations Through Interim Leadership and Strategic Change I am an experienced interim and transition manager with a Master’s degree in Engineering from Arts et Métiers ParisTech (ENSAM). My international, cross-industry background enables me to effectively support organizations in driving operational excellence, managing transformation, and implementing strategic change. Expertise in Transition Leadership As a transition manager, I work in contexts of transformation, crisis, or restructuring. With a solid foundation in civil, mechanical, and electrical engineering, as well as information systems, I bring a comprehensive and hands-on approach to every assignment. Delivering Fast and Sustainable Results I provide high-impact strategic solutions. Whether revitalizing a production unit, leading a transformation plan, or steering a turnaround, I am fully committed to delivering measurable results in complex and high-pressure environments. A Trusted Partner in Change I stand alongside organizations during critical periods to identify opportunities, overcome challenges, and ensure the achievement of their goals. With proven experience and a strong results-driven mindset, I am a reliable ally for securing and executing your strategic initiatives. In Summary As an interim and transition manager, I leverage my leadership, experience, and adaptability to serve your strategic needs. My mission is to drive excellence, build resilience, and guide your organization toward sustainable success. Expertise: Civil – Mechanical – Structural – Electrical (HV/LV) Engineering – Identity Security Skills: Leadership – Lean Management & Manufacturing – Construction – Production – Supply Chain – Engineering – Full P&L Accountability – Operational Oversight – Strategic Planning Soft Skills: Autonomous – Flexible – Problem Solver – Attentive Listener – Empathetic – Solution-Oriented

Liens

Expérience de travail

Interim & Transition Manager

Rexam - Réseau d'Experts Arts et MétiersFreelance

janv. 2024 - Présent

2 ans 10 mois

Petrochemical/Railways/Metallurgical and Heavy Process plant solutions/Aeronautical System & equipment/Mineral-based specialty solutions for industry/Information Technologies

Directeur de projet SMR/SMI (Site de Maintenance & Remisage/Infra) ligne 16&17

FAYAT ÉNERGIE SERVICESFreelance

juil. 2025 - déc. 2025

6 mois

93600 Aulnay-sous-Bois, France

Program Manager for the revision of locomotive BB27000 & 37000 pour Wayden

AkiemFreelance

janv. 2025 - mai 2025

5 mois

Ostricourt, France

• Interim of the leaving Program Manager from End of Project mode to industrialization mode for the revision program of 153 locomotives.

Directeur Technique et Innovation ferroviaire pour Wayden

Groupe CATFreelance

mai 2024 - déc. 2024

8 mois

92150 Suresnes, France

Main action: • Monitoring of the ECM & Quality certification audit by Certifer and non-conformities. • Establishment of the investment plan for 500 car transporters (€100 million) and the 2025-2030 maintenance budget (€50 million). • Implementation of a stock management procedure at the group's various sites (UK, France, Germany, Romania, and the Balkans). • Monitoring of ECM2 maintenance plans and procedures (ranges and nomenclatures). • Support for resource organization and implementation of a communication procedure (RACI) & governance of the department

Project Manager pour Akthéa

ServierFreelance

mars 2024 - mai 2024

3 mois

Le Havre, France

• Audit of the tanks storage and all equipment linked to.

COO

IDEMIA

nov. 2018 - mars 2024

5 ans 5 mois

Tirana, Albanie

ALEAT/IDEMIA is a concession (Build On Transfer) from the Albanian Ministry of Interior started in 2008. • Management of the department of Enrollment, Investigation, Personalization, Distribution of the document (passport & ID) and IT (from 200 to 400 employees) • Relocation of all the Enrolment and Delivery Offices from 2019 till 2021 • Reinforcement of the Quality Assurance process in order to enhance the follow-up of the ISMS/ISO 27001 and eiDAS policies (KPI: 0 major non conformity) .Follow-up and improvement of the quality system

Director of Maintenance

RATP DevFreelance

janv. 2018 - déc. 2018

1 an

Kouba, Algérie

Main action • Implementation & training of the maintenance team for the tramway line of Ouargla. • Purchase of all the tools and equipment as well follow up of the contract of subcontracting

Senior Manager Project Management

Imerys

avr. 2015 - janv. 2018

2 ans 10 mois

25470 Indevillers, France

For this project, Kerneos, acquired in 2017 by Imerys was looking for an experimented Senior Project Manager in order to lead a Major Project of construction and management of a EPCM green project for a cement plant construction in India (40 M€). Main action • Implementation and management of a worldwide expert team (USA/UK/China/India & France) • Review of the previous budget done in 2010 and approval from the COMEX • Transfer of technology from China & UK plant to India • Coordination of the process design, detailed design, purchase, and work on site

Zodiac Aerospace

sept. 2013 - mai 2015

1 an 9 mois

Thaïlande

Director of Operations

mai 2014 - mai 2015

1 an 1 mois

Thaïlande

I was asked to reinforce the organization (team building), to improve the quality and OTD of the process of the 2 departments (CNC, Sheet Metal) and to reorganize the Maintenance Department Other main action • Reorganization of the supply chain and optimization of purchasing (raw materials groups, negotiation of existing transport contracts and implementation of a bar code system)) • Development of marketing actions towards our partners and internal customers (Customer Satisfaction, responsive after-sales service) in order to reconquer certain markets lost a few years previously. • Management of the quality department.

Project Director

sept. 2013 - mai 2014

9 mois

Thaïlande

• Implementation of a small team of engineers in charge of all the FAI (First Article Inspection). • Implementation of a follow-up based on the lean method in order to follow the FAI from start to end in order to avoid rejection during mass production. • Transfer of a production unit from USA to Thailand

Head of Site Activities (Metallurgical plant solutions),

SiemensFreelance

avr. 2011 - mai 2013

2 ans 2 mois

69340 Francheville, France

After a social plan, I have been hired to replace the previous Director after Siemens acquired Clecim. Main action • Replacement the previous Director • Training of the team to the new process of Siemens. • Leading of all the construction and revamping of site around the world (mainly Holland, China, India) for an average of budget of 100 m€ per site

Director of Maintenance

BOLLORÉ AFRICA RAILWAYS

janv. 2008 - mars 2011

3 ans 3 mois

Koza, Cameroun

• Following the departure of the outgoing director, I was approached to implement an internal and external reorganization plan. The scope was over 800 km of single standard gauge railway line and includes railway tracks, bridges and other structures, buildings, energy and signalization and the management of the production workshops for sleepers and fasteners (400 direct employees & 400 subcontracted) • I established the OPEX & CAPEX (from 5 to 10 M€ OPEX and investment* between 30 and 50 M€). Then performed a renewal of the maintenance plan with frequent meetings with all my collaborators along the track in order to re-motivate them. • The main axes of my actions were:  Maintenance of the existing metric single track (800 km).  Control of the track either with a MATISA track inspection vehicle or manually by the teams in place along the track - Ballast replacement (tamping and ballasting)  Replacement of 24 and 39kg rails with 54kg LWR (long welded rails)  Replacement of sleepers with creosote azobé sleepers  Management and maintenance of private junction (Sosucam, Cimencam and Port Autonome de Douala for the main ones)  Negotiation with the World Bank for the rehabilitation project of 125 km of 39kg rail track and steel sleeper  Purchasing of all the equipment to rehabilitate the track (tamper, ballast regulator, track inspection vehicle, etc.…)  Purchasing of 54kg UIC rail and consumables to install them in LWR (long welded rail)

Vossloh

oct. 2001 - déc. 2007

6 ans 3 mois

Niš, Serbie

Managing Director

oct. 2004 - déc. 2007

3 ans 3 mois

Niš, Serbie

• Responsible for the production and installation of equipment (turnouts and signaling) for railways in Serbia, Croatia, Bosnia, Macedonia, etc. • Transfer and installation of all the second-hand CNC equipment from France to the Serbian plant. • Negotiation of an infrastructure maintenance contract with the Croatian tramway company in Zagreb. • Joint venture with Vinci for the construction of the new tramway line in Belgrade (infrastructure part). • In parallel, coordination of a project of transfer of the high-speed technology from France to China.

Project & Operation Manager

oct. 2001 - oct. 2004

3 ans 1 mois

Egypt/Serbia

• Taking over gradually of a production unit (rail machining) and assembly of turnout in SERBIA (200 employees) covering the Balkans with the establishment of a maintenance service. • Training in the company's activities by managing the construction of a standard track switch production plant in EGYPT for ENR (Egyptian National Railways), including the installation of equipment (switches and signaling equipment) on the Egyptian railway.

Project Manager

BP Chimie/TECHNIP/EDB

août 1991 - oct. 2001

10 ans 3 mois

Nigeria/Germany/France

• Sept 98-Oct 01 : Project Manager, DE VIRIS (PARLYM), Engineering Manager for BP Chemicals at Naphtachimie Lavéra/Business Manager for PARLYM & Project Purchaser for Elf Atochem • Aug 95-Sept 98,: Superintendent, TECHNIP GmbH for the construction of the LEUNA 2000 refinery for Elf (GERMANY). • Aug 91-Aug 95 Project Manager, ENTREPOSE DELATTRE BEZONS for the rehabilitation of the crude terminal of Shell in NIGERIA. (50 M €)


Formation

Arts et Métiers - École Nationale Supérieure d'Arts et Métiers