Eric Arthur Derville

Chef de Projet Travaux TCE pour Data Center

Salaire / Taux journalier

68000 Colmar, France

Freelance

Expertises

Gestion des risques

Langues

Français (Maternelle)Anglais

À propos

Introduction

Experienced Project Manager (TCE) for Data Centers and various private tertiary & industrial projects. Proficient in project planning, installation, budget management, contract negotiation, risk management, and coordination of internal services. Skilled in supervising complex construction projects from initial design to final reception, ensuring compliance with standards and budget.

Expérience de travail

Chef de Projet / Consultant (Travaux TCE)

Consultant Indépendant

janv. 2017 - déc. 2021

5 ans

Various

– Led various projects as an independent consultant across different sectors including aluminum transformation, urban development, university campuses, military hospitals, and data centers. Project values ranged from millions to over a hundred million euros. – Mission de conseil : – Élaboration et évaluation des budgets pour l'objectif budgétaire, suivi contractuel. – Contrôle financier, audit des compteurs, gestion des coûts de construction. – Etablissement des rapports techniques, mise à jour du planning et de la mise en œuvre rédaction des notes de calcul. – Organisation: gestion, coordination des différents corps d'états. – Respect et mise en œuvre des mesures de sécurité. – Accompagnement des phases préparatoires, APS, APD, EXE. – Examen des plans d'exécution, des méthodes et vérification de leur cohérence. – Revue des principales quantités. Inspection et suivi continu des travaux, contrôle qualité et inspections, sur site afin de vérifier l'avancement des travaux ainsi que leur conformité au CCAG. – Assistance à la certification des travaux par l'entrepreneur ou les cocontractants, dans le respect des jalons contractuels. – Mise à jour du planning des différentes tâches de travail du projet. – Suivi des travaux, pour les terrassements de grand volume, l'enceinte couverte, les éléments de murs rideaux, les éléments préfabriqués sur mur, gestion budgétaire, mise en œuvre de l'aménagement du Chantier, avec toutes les énergies pour le bon fonctionnement de l'ouvrage. – Prendre toutes les dispositions de sécurité des procédures QHSE. – Accomplir différentes tâches de travail. – Recherche de sous-traitants & fournisseurs. – Préparation des travaux de planification. – Etablissement de la méthode de travail. – Suivi des travaux de A-Z : – Tous types de réseaux: (électricité, eau potable, eaux usées et eaux de surface, et incendie). – Gros œuvre, terrassement béton, fondation, colonne, plancher, clos couvert, bardage, mur rideaux, toiture plate pour la fermeture de l'enceinte couverte, test d'étanchéité, pour la mise aux normes, levée des réserves (OPR), réception des travaux. – Très bonnes connaissance des éléments préfabriqués (façades, mur de soutènement, clôtures etc). – VRD, tous types de réseaux secs et humides - intérieur & extérieur - aménagement de parkings / asphalte. – Jardin paysager, travaux urbains, parc de loisirs. – Key projects during this period include: – 2021: Modification of an aluminum transformation plant for Constellium Biesheim (Colmar). – 2020-2021: Project Manager for Groupe LTW Azur (pricing and tenders). – 2020: VRD & Urban Works Manager for AGIR SA - French Guiana. – 2019: Project Manager for Universités Paris IMT Mines-Télécom (45,000 m2 building, +5 levels and -2 parking, contract value +1 -120 million euros). – 2018-2019: Project Manager for Malice SA - Brussels (major transformation of a military hospital, value +1 -35 million euros; also DATA Center Police INTERPO - 850 m² metallic structure, BA floor). – 2017-2018: Project Manager for Industrial Contractors S.A - Ivory Coast. – 2017: Project Manager for SEMACO SPRL - Supervision of works, DATA Center Google Ghlin Belgium (10,000 m² metallic structure, BA floor, concrete frame closure) - 22 million euros.

Construction Manager TCE

OGER SAOUDITE

déc. 2010 - déc. 2016

6 ans 1 mois

Riyad Arabie saoudite

– Managed the 'Villas 6000 unités' project, featuring prefabricated modules (240 m2 Duplex), with a contract value exceeding 300 million dollars.

Chef de chantier travaux de groupe GO & VRD & TCE (Général)

BOUYGUES BATIMENT INTERNATIONAL

janv. 2008 - janv. 2010

2 ans 1 mois

Turkmenistan, Turkménistan

– Detailed work plan for the OGUZKENT 5-star hotel project. – Responsible for Structural Works (GO) & Finishing, including special works. – Construction of a 13-story + 2-basement hotel complex, involving 75,000 m3 of concrete. – Managed the installation of floors, posts, and beams, civil engineering, and connection of various underground networks, reservoirs, and access roads. – Oversaw special works such as the installation of a 750 m² slab, anti-seismic and acoustic installations on BoxSpring.

Chef de Projet d'Agence

BATRACO - BTC SPRL

janv. 2004 - janv. 2007

3 ans 1 mois

Burundi, Rwanda, Congo RDC

– Managed an annual turnover of 120 million USD with a team of 8 works supervisors, 1 document support, 4 foremen, and 145 employees. – Responsible for various projects, activity monitoring, financial and commercial management, in discussion and negotiation with clients and local authorities. – Key projects included: – **PTA Bank Project**: Construction of a 27,000 m3 reinforced concrete building. – **ONUB Project**: Construction of a life base, comprising 75 prefabricated units (+ - 145 m²), an underground building for weapons, office, restaurant, and dormitory, on 8 hectares for ONUB BURUNDI. – **Emergency Hospital** in GITEGA, including 2 surgical blocks and 45 beds. – Rehabilitation of an 8 km road and urban sanitation for the hospital emergency, funded by ONUB - Jordan. – Construction of helicopter landing strips (8 x 60 m diameter), radio post, radar post, and master beacon post, controlling 2 hectares.

Ingénieur travaux GO & TCE

GROUPE GFI FORREST

janv. 1994 - janv. 2000

6 ans 1 mois

Rwanda, Burundi

– Piloted and monitored construction sites, and handled administrative and commercial activities. – Key projects included: – **Bujumbura Port Project**: Rehabilitation of crane tracks, redevelopment of berths, storage areas, technical canals, and mooring quays. – **REGIDESO AEP Project**: Rehabilitation of reservoirs and slow filters. Construction of 5 water treatment stations (x1500 m3) for several cities (PAM - Burundi funding). Rehabilitation of a 24 km road section with 12 structures. – Construction of an 8-hectare children's village for war orphans (client: SOS Village d'Enfants Kinderdorf, NGO - Switzerland). – Rehabilitation + new construction of the Dutch Embassy in Kigali, Rwanda. – **CICR Project**: AEP 4500 ml of various diameters, water treatment plant, collection, reservoir construction. – **European Union Project**: 19 catchment lots for AEP. Installation of treatment with 79 km of EPA water networks, by gravity and pumping, in different cities. Civil engineering - marsh development with dikes in Nyabarongo valley - 1,500,000 m3 of earthworks. Construction of several dams and dikes in BA, control system with valves, large diameter metal pipes for forced passage, redistribution collectors (irrigation for rice cultivation on 5 ha). Creation of access roads and bridges (maintenance tracks).

Ingénieur section GO - TCE - Bâtiment

ETS - FRANÇOIS

janv. 1992 - janv. 1993

1 an 1 mois

Bruxelles, Belgique

– Construction of the European Union building in Brussels, rehabilitation of the building - (Bairlemont) - Brussels. – Special tasks: Management of works and organization of asbestos removal zones. – Installation of 8,950 m2 of masonry and plasterboard. – Laying of 15,500 m² of screeds, and wall & floor coverings. Relationship and online negotiation with the client's representative (Architecture office). – Establishment of the budgetary objective, contractual project monitoring. – Transfer of material controls. Negotiation and implementation of sub-contracts. – Control and monitoring of quantities, verification of meters, management of construction costs. – Establishment of schedules, updating and drafting of calculation notes, supervision of all trades. – Budgetary monitoring - Respect and implementation of security measures.

Ingénieur travaux

GROUPE GFI FORREST

janv. 1988 - janv. 1991

3 ans 1 mois

Kolwezi, République démocratique du Congo

– Civil engineering: installation of a 25 km pipeline for the discharge of muddy waters from the open-pit mine, with creation of decantation basins and storm basins. – Construction of paved roads in the mining city (8 km), maintenance of mining road. – Construction of a metal hangar for the DUMPER 250 T maintenance center.

Calculateur métreur / deviseur / préparateur de construction

ETS - T PALM (Bureau d'études)

janv. 1987 - janv. 1988

1 an 1 mois

Verviers, Belgique

– Prepared construction sites. – Controlled and verified meters, managed construction costs, and controlled building materials (TCE).


Formation

Centre de formation universitaire (Charleroi- Belgique)

Certificat de gestion, Gestion de projet de construction pour les petites et moyennes entreprises

1994 - 1994

1 mois

Institut supérieur de Liège

Ingénieur industriel, Construction / bâtiment / tous types de travaux et réseaux urbains

1987 - 1987

1 mois


Licences et certifications

Logiciel MS Project et Primavera P3

Délivré le : janv. 2010

Certifié par TEC

Gestion des Procédures, PSS, QSE

Délivré le : janv. 2010

Certifié par Bouygues Building International

Le meilleur endroit pour trouver votre prochaine opportunité

© 2026. Tous droits réservés.

Talents

Trouver un job

Créer un profil

Solutions et outils