Fabrice-17072025 MPACKO-17072025

Senior IT/OT/Data Project Manager

Salaire / Taux journalier

76240 Le Mesnil-Esnard, France

Freelance, ouvert au CDI

Peut venir sur site

Expertises

Test DesignConseil ITProject OwnerGestion de projet - PMOData EngineeringJenkinsRESTful APIsAzureBig DataOracle DatabaseGoogle Cloud PlatformMicrosoft SQL ServerProduct ManagementProduct OwnershipWeb3DockerPostmanDesign ThinkingDesign SystemAnsibleScrumConfluenceJiraIllustrationAutodesk 3ds MaxERPIAAWSKubernetes

Langues

AnglaisFrançais

À propos

Introduction

IT/OT/DATA Director with 25+ years delivering complex infrastructure projects for major enterprises. Led 5 ECM modernization projects serving 76K users, specializing in OpenText Documentum, Oracle systems, and industrial automation. Expert in end-to-end project management with proven results in cost reduction and system optimization.

Liens

Expérience de travail

IT/OT/DATA Project Manager

Sopra Steria

juin 2007 - juil. 2025

18 ans 2 mois

Ile de france, France · Hybrid

As an application and IT infrastructure manager and system integrator, I have successfully delivered various customer projects in the following domains: - Ensured the reliability and availability of IS services through a robust continuity management approach - Facilitated data exchange and interoperability among different procurement applications - Established a new policy for purchasing IT services that aligns with the business needs and objectives - Designed and implemented an IT infrastructure that supports the operational and strategic requirements of the organization - Developed and deployed applications that enhance the functionality and performance of the IS systems - Conducted RFx processes to select the best contractors for the projects - Oversaw the build and run phases of the applications and IT infrastructure projects, ensuring quality, timeliness and cost-effectiveness - Led 5 projects to address the technical obsolescence of ECM systems for the industrial departments that manage thermal and hydraulic plants of french electricity producers (76K users) - Performed transversal activities such as master planning, budget tracking, planning monitoring, scope, cost, time, issue, risk, resource, communication and stakeholder management. Environnements : #OpenText #Documentum (#Xplore 16.4, #Webtop 16.4, #Content #server, #Composer, #Administrator), #Oracle, #DevOps et #infrastructures #IT, #JIRA, #Planview, #Historian (#IP21 #AspenTech, #PI #OsiSoft), #API (#REST and #SOAP)

Vehicule Systems Project Manager

See4sys Technologie

sept. 2006 - mai 2007

9 mois

Val d'oise · On-site

As a Vehicle Systems project manager, I have been responsible for leading and completing various projects related to automotive electrical/electronic functions. These projects involved collaborating with different stakeholders, managing the scope, cost, time, issue, risk, resource, and communication aspects, and delivering the final products according to the agreed specifications. Some of the products I have worked on include a body controller module, a smart entry start system, a tyre pressure monitoring system, and a battery monitoring system.

IT/OT/DATA Project Manager

Capgemini Engineering

janv. 2002 - août 2006

4 ans 8 mois

Paris Area, France · On-site

I have been involved in various stages of project management, from initiation to closure, ensuring that the project scope, cost, time, risk, resource, communication, and stakeholder management are aligned with the agreed expectations. Some of the customer projects I have realized in the car industry are: - I managed the software development of a validation plant tool that would test the functionality and performance of different car components. - I managed the software and hardware development of the test benches that would simulate the real-world conditions and scenarios for car testing.

IT/OT Project Manager

Assystem

juil. 1999 - déc. 2001

2 ans 6 mois

Paris Area, France · On-site

As a IT/OT project manager, I have been involved in various stages of project life cycle, from initiation to closure. I have applied my skills in scope, cost, time, issue, risk, resource, communication, and stakeholder management to deliver successful outcomes for my customers. Some of the projects I have realized are: - Developing an automatic pilot system for a competition sailing boat. This project required me to collaborate with engineers and sailors to design and test a software that can control the boat's navigation and speed in different weather conditions. - Studying the feasibility of an electronics application that can detect crash situations in anticipation. This project involved me to research and analyze the market demand, technical specifications, and ethical implications of such a device. - Integrating industrial robots into an automotive production line. This project challenged me to coordinate with factory workers, suppliers, and quality assurance teams to ensure a smooth and safe transition from manual to automated processes. - Working as a technical writer for household appliances. This project allowed me to use my creativity and attention to detail to produce clear and user-friendly manuals that can assist after-sales operators and customers.


Formation

Arts et Métiers - École Nationale Supérieure d'Arts et Métiers

DEA de Robotique

1998 - 1999

11 mois

Pierre and Marie Curie University

Maitrise de Mécanique

1996 - 1997

11 mois

Pierre and Marie Curie University

Licence de Mécanique

1995 - 1996

11 mois

Pierre and Marie Curie University

Diplôme d'études universitaires générales (DEUG)

1993 - 1995

1 an 11 mois

BTS NDRC lycée Paul Langevin

Baccalauréat général

1992 - 1993

11 mois

Le meilleur endroit pour trouver votre prochaine opportunité

© 2026. Tous droits réservés.