
Majdi KAROUIA
Senior Supply Chain Project Leader
Salaire / Taux journalier
51100 Reims, France
Mobilité : Paris, Marseille
Freelance, ouvert au CDI
Peut venir sur site
Expertises
À propos
Introduction
Supply Chain Engineer with 15+ years of expertise in automotive logistics and project management. Successfully led 27+ projects annually with 96% completion rate. Specialized in Lean Manufacturing, SAP implementation, and logistics optimization delivering measurable cost reductions.
Expérience de travail
Trèves Group
févr. 2017 - août 2025
8 ans 7 mois
51100 Reims, France
Supply Chain project Leader
févr. 2017 - août 2025
8 ans 7 mois
51100 Reims, France
• Implementation of the new projects logistics flows (inbound, internal and outbound) • Packaging development (Concept, loop calculation, validation...) • Implementation of information flow (EDI connection, ERP set up, labels and shipment documents development…) • External and internal warehouses implementation • Logistics protocol and contracts preparation • Cost and lead time reduction and quality respect • Control of the financial flow (invoicing, VAT, taxes…) • Standard tools implementation and follow up (Sales and Operation Plan, Master Production Schedule and Supplier Program) Realisation: + Management of 27 projects per year with an average of progress of 96% and 100% of project reviews realised on time. + Support of the plants on 13 projects per year with an average of progress of 90% and 100% of project reviews realised on time.
Supply Chain project Leader
févr. 2017 - août 2025
8 ans 7 mois
51100 Reims, France
Engineering Supply Chain leader - Serial life
TREVES
janv. 2014 - mars 2017
3 ans 3 mois
Région de Reims, France
• Development and improvement of Supply Chain Standards • Training of the new logistics mangers on the pull system, stock optimisation and the Visual management • Expertise in internal flow management and support of the different group factories • Evaluation of the Supply Chain standards implementation in the different production sites, preparation and implementation of the action plan to improve the group results • Reporting and action plan monitoring of the group stock level, customers service rates and logistics incidents Realisation: + Improvement of the Group standard tools implementation from 3.1/5 to 3.9/5 + Improvement of the group service rate from 92% to 99% in serial life and from 50% to 70% for spare parts + Implementation of two logistics warehouses
Supply Chain Consultant
OGIP Organisation
mai 2011 - janv. 2014
2 ans 9 mois
Région de Lille, France
Missions carried out in the following automotive companies: Faurecia Marines (France) Faurecia Interior System (Germany) Faurecia Interior System Scheuerfeld (Germany) Faurecia Interior System Hlohovec (Slovakia) Faurecia Interior System Kennelbach (Autstria) Faurecia Automotive Composite, Theillay (France) EBERSPAECHER, Saint Michel (France) YKK, Seclin, (France) Realisations: •Analysis and implementation of logistics platforms and warehouses •Development of production planning tools SOP-PIC/MPS-PDP •Pull System tools implementation (Kanban, Sequencer, Batch building box…) •Writing Specification and ERP modification follow up •Stock Optimisation • “Hoshin” workshop monitoring • Lean Manufacturing tools implementation
Supply Chain assistant
Vallourec
juil. 2010 - mars 2011
9 mois
Aulnoye-Aymeries, France
• Project Management of key Performance Indicators integration on SAP 5
Production leader Supply Chain
Oxylane Group (Decathlon)
juin 2009 - déc. 2009
7 mois
Région de Lille, France
• Production scheduling and follow up • Material planning and stock optimisation • Negotiation and supplier animation to improve Lead Time and production capacity => Lead Time reduction from 35 to 21 days; 28% of Stock reduction; 18% of Customer service rate improvement
Continuous Improvement Trainee
Valeo
juin 2008 - déc. 2008
7 mois
Région de Laval, France
• Value Stream Mapping and Visual Reorder implementation • Stock optimisation • 7 Waists hunting and work stations Ergonomic Improvement • Kanban cards system Implementation
Formation
IAE Lille
Master en administration des affaires
2009 - 2011
1 an 7 mois
Ecole centrale Lille
Master 2 (M2)
2009 - 2010
1 an 2 mois
ENSAIT : École Nationale Supérieure des Arts et Industries Textiles
Engineer's degree
2007 - 2009
3 ans
National Engineering School of Tunis (ENIT), University of Tunis El Manar
Engineer's degree
2005 - 2007
3 ans
Licences et certifications
CERTIFICATION BRIGHT
Délivré le : juin 2019