Nabil TADILI

Senior Software Architect | Full Stack & AI

Salaire / Taux journalier

Rabat, Maroc

Freelance

À distance uniquement

Expertises

.NETAngularBlockchainJavaMicroservicesMachine LearningDevOps

Langues

ArabeAnglaisFrançais

À propos

Introduction

Software Architect with 10+ years spanning full-stack development, AI integration, and blockchain solutions. Led microservices transitions at Orange Business, delivered 110+ freelance projects with 99% positive reviews, and specialized in .NET/Angular/iOS development. Ready to architect scalable solutions that drive your digital transformation.

Liens

Expérience de travail

Technical Consultant - Full Stack & AI Integration (.NET, Kotlin, Angular, LLMs, Azure)

SPVIE Assurances

mai 2024 - Présent

2 ans 6 mois

Lead Software Architect .NET

Orange Business

mai 2023 - mai 2024

1 an 1 mois

Rabat, Maroc

• Leading the transition to Microservices Architecture to enhance system scalability, resilience, and maintainability • Implementing DevSecOps practices to strengthen the security posture and streamline the software development lifecycle. (CI/CD, Ansible, AWX, GitLab, Automated Testing) • Automating Jira with APIs to improve team productivity, project management, and cross-functional collaboration. • Full Stack Evangelism to encourage a comprehensive understanding of both front-end and back-end technologies, fostering collaboration and knowledge-sharing. (React, Angular, Svelte, SvelteKit, .NET, Java, Python, tRPC, gRPC, GraphQL) (Team = Global Wholesale and Enterprise Networks (GWEN), Business Operation & Support (BOS))

Freelance - Software Architecture & Systems Design

FiverrFreelance

mars 2013 - janv. 2024

10 ans 11 mois

International Falls, Minnesota 56649, États-Unis

(Level 2 - 110+ Orders - 99% Positive Reviews) • Software Architecture • Google App Scripting & Automation • Smart Contracts

Consultant - Full Stack Lead at OINIS (.NET & Angular)

Orange Business Services

mai 2022 - mai 2023

1 an 1 mois

• Software architecture and design with microservices: client app, API Gateway, services, protocols, message queues, distributed caching. • Designing and building a solution that helps users manage financial plans related to network migrations. Tech: Angular 13.3.11 + ASP.NET 6.0 gRPC + Entity Framework Core 6 + Ocelot 18.0 + RabbitMQ. (Team = Global Wholesale and Enterprise Networks (GWEN), Business Operation & Support (BOS))

Software Architect

PAPER

mars 2022 - juil. 2022

5 mois

Paris, France

• iOS SwiftUI native app development • Full-Stack web development (Next.js, Express, GraphQL, Graph Databases) • Blockchain / Smart Contracts / NFTs Paper is a blockchain social app where users get rewarded through social interactions and mini-games 📍

Digital Manufacturing - Development Team Leader (IS)

Safran

févr. 2019 - mars 2022

3 ans 2 mois

Morocco & France

• Helping the business achieve a successful transformation through digital manufacturing applications. (ASP.NET Core MVC, Angular 8, WPF) • Research and development with Machine Learning and Deep Learning (Tensorflow) • Successful proof of concept using Tensorflow, Keras, and OpenCV to automate production processes in manufacturing (Environment: Python, Scikit-Learn, WPF)

Safran Electrical & Power

juil. 2013 - mars 2019

5 ans 9 mois

Morocco, Indiana 47963, États-Unis

Digital Development Manager (Business Unit)

janv. 2018 - mars 2019

1 an 3 mois

Morocco, Indiana 47963, États-Unis

• Digital Transformation: Planning & Scheduling - Manufacturing Execution Systems (MES) • Time Attendance: Horoquartz Activity - eTemptation Suite • Systems & Operations Support for ERP SAP PP ( ~ 1500 Employees) • Software Engineering (C#, WPF, Asp.Net MVC) • Data Analysis, Reporting, Dashboards (Power BI / Power Query) • Continuous Improvement • Black Belt Project: Production Planning and Monitoring for the Smart Factory • Coaching & Training: Green Belt Projects, Microsoft Excel & VBA, SAP

Key User SAP (Production and Planning Module)+ Industrial & Software Engineer (Business Unit)

oct. 2015 - déc. 2017

2 ans 3 mois

Morocco, Indiana 47963, États-Unis

• 2015-2016: ERP Migration Project (From BPCS to SAP) • 2016-2017: Key User SAP + SCM/ERP/Reporting Project Leader

Industrial & Software Engineer (Business Unit, A350 Program)

juil. 2013 - oct. 2015

2 ans 4 mois

Morocco, Indiana 47963, États-Unis

• Digital Jigboard Harness Manufacturing Project ( + Desktop App Programming with C# / WPF) • Tools Prototyping with the adoption of 3D printing (Ultimaker 2) • Digital Visual Management with IObeya • Takt Time Application ( VB.NET / WPF with MS V.S. + Blend ) • Data Analysis & Optimisation with Operation Research >-- Standard-Times Allocation >-- Workload & Capacity Calculation >-- Space Requirement Prediction Models

Internship Senior Project : Productivity Improvement (A350)

Labinal

mars 2013 - juil. 2013

5 mois

Morocco, Indiana 47963, États-Unis

• Productivity Improvement through the "Pacing System" Project (Flexible Takt Time) • Overhaul of the Production Planning & Scheduling System • Space Optimization (Operation Research & Brute Force using Java as a Programming Language)

Summer Internship: Forecasting and Inventory Management

Quiniz S.A.R.L

août 2012 - oct. 2012

3 mois

10046 Marocchi, Turin, Italie

• Evaluating the optimal service level for seasonal items, considering under- and overstocking costs

Summer Internship: CAD Departement

Labinal

juin 2012 - juil. 2012

2 mois

10046 Marocchi, Turin, Italie

• Identifying areas of improvement through VSM (Value Stream Mapping) • Designing a detailed flow-chart of the CAD department • Improvements on the CAD follow-up system

Summer Internship: Process Manager Assistant

Fruit of the Loom, Inc.

mai 2012 - juil. 2012

3 mois

10046 Marocchi, Turin, Italie

• Applying the S.M.E.D method to reduce the time needed to change the type of production • Designing layouts for the project “Three Minute Lesson”

Summer Internship: Stock Management and Forecasting

Cimpor

juin 2011 - juil. 2011

2 mois

10046 Marocchi, Turin, Italie

• Minimizing the value of stored items in inventories to free up resources • Establishing forecasts about product usage to avoid stock-outs


Formation

Georgia Institute of Technology

Master of Science

2021 - 2024

3 ans 5 mois

International Institute for Higher Education in Morocco (IIHEM)

Master of Engineering - MEng

2008 - 2013

6 ans

Le meilleur endroit pour trouver votre prochaine opportunité

© 2026. Tous droits réservés.