
Ozgun Dogan
Planning Chief
Salary / Daily rate
Ankara, Türkiye
Freelance, open to permanent contract
Skills
Languages
About me
Intro
Production Planning Chief with expertise in process optimization and industrial engineering. Proven experience in Excel VBA, production planning, and implementing continuous improvement. Specialized in SAP/MRP systems and analytical solutions to streamline manufacturing operations and boost efficiency.
Work experience
Production& Production Planning Manager
Doraglass
Jul 2023 - Present
3 years 4 months
Turkey, NC 28393, USA
• Expanded existing ERP system to attain a systematic approach for planning, on-time delivery performance has increased from 32.35% to 92.43% in 4 months. • Increased production throughput by 9.46 %. • Assigned production resources/tools into the system. By structuring their movements to be managed through the system, real-time information flow and accuracy were ensured, and queue times were reduced significantly. • Created VBA based Gannt Chart for more effective and efficient planning. • Delivered works for the expansion of the ERP system are; o Routes had been determined and assigned to the material codes. o Scrap ratios have been calculated for each material code. o Capacity planning table in the ERP system has been created. o BOM and product trees were defined into the system. o Safety stock quantities were defined, and purchase requisition triggers were integrated into the system. o System controls were added to enhance data accuracy for effective planning. o MRP structure was designed and implemented. o To achieve a much more optimal cutting plan, production order screen was modified to include additional filters. Visual follow-ups and alerts were also integrated into the system.
Supply Chain Supervisor
Bursalı Group
Apr 2019 - Sep 2021
2 years 6 months
Turkey, NC 28393, USA
• Created VBA based Gannt Chart for more effective and efficient planning including deadline tracking automation, short/over production and machine capacity report, calculating optimum set-ups, raw material requirement report. • Created machine capacity report for processes before and after weaving and foreseeing bottlenecks, achieved %15 improvement on production downtime. • Tracked orders situations and determined submaterial supply dates and shipment dates. Decided which orders to be outsourced.
SAP Key User
Beyçelik Gestamp
Jan 2018 - Apr 2019
1 year 4 months
Turkey, NC 28393, USA
• Provided key technical and subject matter expertise in Manufacturing, Inventory, Quality and Maintenance modules of the SAP S/4HANA system in a regulated, validated environment. • Successfully deployed PP-MM-QM-PM modules by going through each implementation phase and provided training for end users. • Carried out troubleshooting and assisted Production system break/ fix requests associated with the MM, PP, QM and PM modules.
Planning Engineer
Bayraktar Group- FARBA
Jul 2013 - Jan 2018
4 years 7 months
Turkey, NC 28393, USA
• Designed Assembly Line Planning Program and Subcomponents Planning Programs architecture to advance the planning process and written the codes in Excel VBA. Assembly Line Planning Program encompasses; o Auto Schedule with shift input ( 2 weeks shift plans & 1 year week plans) o Instant calculation day stock levels of the products which allows smoother planning -Capacity Report o Stock Reports o Headcount Report Subcomponents Planning Program includes; o Auto Optimum Lot size calculation (based on demands, scrap ratio, breakdown and capacity) o Auto production quantity calculation o Allowing better visual control by highlighting stocks running short o Capacity Report o Headcount Report
Planning Engineer
Bayraktar Group- AYGERSAN
Nov 2011 - Jul 2013
1 year 9 months
Turkey, NC 28393, USA
• Implemented Kanban system in Press Department. • Handled defense industry parts planning and press department planning. • Lead process improvement practices; applied value stream mapping methodology to analyze current state& future state and initiated Continuous Process Improvement Projects.